Step marked complete
F
Aekam FloorPliot
Operator Edition
STATION 04 • LEAK TEST CELL

Welcome, Operator

Sign in with your badge to begin your shift

Trouble signing in?
Today's recent activity
Last sign-in: Yesterday 14:02 • Station 04 • 28 parts inspected • 0 escapes
Signed in
Job Setup
Work Instructions

Start a Job

Scan or enter your work order to load the right inspection plan

1
Work Order
Scan the work order barcode or enter manually
2
Part Number
Select the part — this loads the inspection plan
3
Operation Sequence Step
Choose where you are in the routing
4
Serial Number
Scan the unit serial — each part is traced individually
Select a part to load the inspection plan
Helium Leak Test • Sniffer Method

Step 1 / Equipment Pre-Check & Startup

Verify detector readiness before testing any parts

Step Timer
00:14
Critical Parameters
Tools & PPE
Do NOT
Recommended Steps
FloorPliot AI Suggests
Common questions for this step
FINAL STEP

Final Disposition

Confirm the result of this inspection and capture any exceptions

Test Result
3.2 g/yr
Within ≤ 5 g/yr limit
Calibration
9.8 × 10⁻⁷
Within spec
Test Pressure
30.2 PSI
Within ± 0.5 PSI
Cycle Time
3:48
vs. 4:00 target
Disposition
Exceptions / Notes (Optional)
Ready to sign off?
Your badge ID will electronically sign this inspection record
SIGNED & ARCHIVED

Inspection Report

Record automatically saved to QMS and traceability log

F
Aekam FloorPliot
Final Inspection Checklist • Helium Leak Test
Document No.
FIR-26041278-001
Generated 16 May 2026, 14:34
PASS
All checks within specification
This unit is released to the next operation
Work Order
WO-2026-04127
Part Number
PN-AC-EVAP-2410 Rev. C
Serial Number
SN-EVAP-26041278
Operation
OP-030 Final Inspection
Customer
Sundaram-Clayton
Standard
ISO 20485
Plan Revision
WI-LT-EVAP v2.3
Station
Station 04 • Leak Test Cell
Step-by-Step Verification
Test Conditions
Test Pressure30.2 PSI
Gas Mixture95% N₂ / 5% He
Ambient Temp23.4 °C
Stabilization Time45 s
Test Results
Calibration Reading9.8 × 10⁻⁷ mbar·L/s
Measured Leak Rate3.2 g/yr
Specification Limit≤ 5 g/yr
Margin to Limit36% under
Ravi Kumar
Operator • EMP-1042
Signed 16 May 2026, 14:34:02 IST
Digital signature: 0x7a3f...c41e
Auto-Released by FloorPliot
System • All required actions completed
QMS Record ID: QMS-2026-04-04127-001
This record is electronically signed per 21 CFR Part 11 and stored immutably in the Aekam FloorPliot QMS.
Page 1 of 1
Downstream Actions Triggered
ERP work order updated — 241 / 600 EA inspected
Serial SN-EVAP-26041278 marked "Released to OP-040 Packaging"
Quality KPI dashboard updated — FPY today: 99.6%
PDF copy archived to customer audit folder (Sundaram-Clayton)